Projects per year
- 350 - 400 out of 2,171 results
Search results
-
Industry
Switch Locking Mechanism Analysis
Roberts, C. & Hemida, H.
NETWORK RAIL INFRASTRUCTURE LTD
1/06/10 → 31/08/11
Project: Industry
-
Achieving improvements in track circuit reliability (Feasibility study) Challenge 9
Roberts, C.
1/09/14 → 21/10/16
Project: Industry
-
Provision of Technical Assistance to Mainstreaming Climate Resilience Risk in Road Management in Bosnia and Herzegovina
Ghataora, G. & Burrow, M.
6/11/17 → 31/07/18
Project: Industry
-
Research on High Speed Maglev System Graphical Modelling and Design Simulation Optimisation Platform
Chen, L. & Roberts, C.
1/12/19 → 30/10/22
Project: Industry
-
Powertrain: Fuel Cell Electric Multiple Unit (FCEMU)
Hillmansen, S. & Roberts, C.
2/10/15 → 10/05/16
Project: Industry
-
Investigation of Voice-Based Aims and User Issues
NCR FINANCIAL SOLUTIONS GROUP LTD
1/06/94 → 30/09/94
Project: Industry
-
Analysis of Point Condition Monitoring Data
Roberts, C.
CARILLION CONSTRUCTION LIMITED
1/11/04 → 31/07/05
Project: Industry
-
-
Adsorption refrigeration - Student Support
WEATHERITE MANUFACTURING LIMITED
1/04/09 → 31/03/12
Project: Industry
-
Measurement of Train Slipstreams for assessment of OHL construction safety
Baker, C. & Quinn, A.
NETWORK RAIL INFRASTRUCTURE LTD
1/08/12 → 31/12/12
Project: Industry
-
Feasibility study to assess the potential to develop a portable device to allow charter services to operate on ETCS enabled lines
Chen, L. & Roberts, C.
NETWORK RAIL INFRASTRUCTURE LTD
1/11/19 → 31/01/20
Project: Industry
-
Simulation & Testing of Railway Traffic Management & Train Control Algorithms
Roberts, C.
4/10/10 → 3/04/14
Project: Industry
-
Dialogue Design for Voice-based ATM
NCR FINANCIAL SOLUTIONS GROUP LTD
1/10/95 → 31/05/96
Project: Industry
-
Acumen / Platform Docker - Development Phase 2
Roberts, C., Easton, J., Stewart, E. & Chen, L.
NETWORK RAIL INFRASTRUCTURE LTD
1/07/20 → 31/03/21
Project: Industry
-
-
Embedding Sustainability in Rail Projects
Quinn, A. & Braithwaite, P.
1/11/13 → 31/07/15
Project: Industry
-
Development of Dual-mode Engine AI Emission Prediction and Knock Detection
13/02/23 → 12/11/26
Project: Industry
-
-
-
-
Jaguar CONCEPT Project
Xu, H. & Wyszynski, M.
BIRMINGHAM RESEARCH & DEVELOPMENT LTD
1/03/08 → 31/12/12
Project: Industry
-
-
Manufacturing Portfolio Capability Acquisition Projects - Upscaled Technology Testing and Demonstration
Blackburn, S., Hood, R., Basoalto, H., Warnken, N. & Green, N.
1/08/18 → 31/07/24
Project: Industry
-
CLEAR2: T1234 Air Quality on Trains-HVAC and Exhaust Interactions Study
Hemida, H., Mills, S., Soper, D., Hillmansen, S. & Entezami, M.
10/02/21 → 30/03/22
Project: Industry
-
Investigation of wind tunnel ground configurations on aerodynamic forces and moments
24/09/13 → 28/02/14
Project: Industry
-
-
-
-
Advanced 3D laser processing for surface structuring, texturing and polishing MTC PhD
The Manufacturing Technology Centre Ltd
1/10/19 → 30/09/22
Project: Industry
-
DECARB: Whole life carbon reduction in trains through effective design and specification [T1237-01]
Hillmansen, S., Tricoli, P., Wilson, G. & Kent, S.
1/04/21 → 31/03/22
Project: Industry
-
-
Computer Simulation Study of a 3 Phase reversablew AC/DC Static Converter
Evans, P.
1/08/92 → 31/08/92
Project: Industry
-
-
Research & Development of Saber Models for Aircraft Systems
Forsyth, A. & Mollov, S.
18/09/00 → 17/11/00
Project: Industry
-
-
GTRM - Ecotrack Support
Madelin, K.
G T RAILWAY MAINTENANCE LIMITED
1/10/00 → 30/09/02
Project: Industry
-
-
CASE (Kennedy R) - Safety culture assessment methoddevelopment
Kirwan, B.
1/03/94 → 28/02/97
Project: Industry
-
-
-
CASE(Coley): Development of High Performance Seals forBearings
Hall, F.
NSK RHP EUROPEAN TECHNOLOGY CENTRE
1/10/97 → 30/09/00
Project: Industry
-
-
Modelling of Damage Evolution in Hot Rolling Process
Lin, J. & Ball, A.
1/10/99 → 30/09/02
Project: Industry
-
Application of 'Internal Model Control' to Missile Guidance
Norton, J.
DEFENCE SCIENCE & TECHNOLOGY LABORATORY
1/06/02 → 31/03/03
Project: Industry
-
Advanced Error Management in High-Speed Communications Case-Like Studentship
Woolley, S.
FUJITSU TELECOMMUNICATIONS EUROPE LTD
1/04/98 → 31/03/00
Project: Industry
-
Early Failure System for Points and Other CriticalMechanical Equipment (Commission No 8072)
Allan, J.
1/08/93 → 31/07/95
Project: Industry
-
-
-
Direct Digital Synthesis
Gardner, P.
SECURICOR WIRELESS TECHNOLOGY LTD
1/10/01 → 31/03/05
Project: Industry
-
Bond Tests in TSA Columns
Gorst, N. & Clark, L.
RAYNESWAY CONSTRUCTION SOUTHERN LIMITED
1/01/01 → 30/06/01
Project: Industry