Projects per year
- 100 - 150 out of 518 results
Search results
-
Industry
New Engineering Contract - Development of Flowchart
Perry, J.
THOMAS TELFORD SERVICES LIMITED
1/04/97 → 31/12/99
Project: Industry
-
-
Link: An Integrated Strategic Planning Process for Road Maintenance
Snaith, M.
1/03/98 → 31/03/00
Project: Industry
-
Assess the Feasibility of Using LUL Data and Rules within Railtrack
Madelin, K.
1/10/00 → 31/01/01
Project: Industry
-
-
-
-
A Radical Redesign of the In Situ Concrete Frame Process
Clark, L. & Seymour, D.
BUILDING RESEARCH ESTABLISHMENT - BRE0001
1/10/97 → 31/08/99
Project: Industry
-
Research into Groundwater Resources in Dover (Phases 1-3)
Rushton, K.
1/01/94 → 30/04/96
Project: Industry
-
Folkstone Model (Phase II)
Rushton, K.
FOLKESTONE & DISTRICT WATER COMPANY
1/08/92 → 31/12/92
Project: Industry
-
-
-
Student Support: Ms Nicola Metje
Coates, L. & West, J.
PROUDMAN OCEANOGRAPHIC LABORATORY
1/07/98 → 30/06/01
Project: Industry
-
EPSRC Case Award - Increasing the efficiency of anaerobic waste digesters
Bridgeman, J.
1/09/10 → 28/02/14
Project: Industry
-
-
T1303 - 'Superfast Freight': aerodynamic assessments and mitigations
28/11/22 → 28/03/23
Project: Industry
-
Utilisation of Quarry Wastes Including Filler Dust, Lagoon Silts and Fine Sands
Ghataora, G., Freer-Hewish, R. & Veasey, T.
ENVIRONMENTAL EDUCATION & TRAINING TRUST LTD
1/11/00 → 31/10/03
Project: Industry
-
-
Research on New Asset Management Approaches for Maintaining and Improving Local Road Access - Phase 1 (16-0755)
Burrow, M. & Ghataora, G.
ROUGHTON INTERNATIONAL LIMITED
1/11/15 → 31/08/17
Project: Industry
-
-
Intelligent Excavation Spring - Phase 2
TRANSPORT SYSTEMS CATAPULT LTD
11/01/18 → 31/07/19
Project: Industry
-
DECARB: Whole life carbon reduction in trains through effective design and specification [T1237-01]
Hillmansen, S., Tricoli, P., Wilson, G. & Kent, S.
1/04/21 → 31/03/22
Project: Industry
-
(Linked to RXCC16029) Visualisation of train delay impact data in order to improve decision making (mini project)
Roberts, C. & Schmid, F.
NETWORK RAIL INFRASTRUCTURE LTD
1/04/12 → 31/03/13
Project: Industry
-
Real Time Network Instrumentation Phase 2
Chapman, D., Metje, N. & Ward, M.
UK WATER INDUSTRY RESEARCH LTD
1/10/10 → 30/11/13
Project: Industry
-
Laboratory and Site Work Associated with Clay Stabilisation at 84 Broadmoor Lane, Bath
Rogers, C. & Boardman, D.
1/01/01 → 30/09/05
Project: Industry
-
-
-
-
Algorithms to Predict Switch Failure for Intelligent Infrastructure
Roberts, C. & Watson, C.
NETWORK RAIL INFRASTRUCTURE LTD
1/07/11 → 30/06/13
Project: Industry
-
-
A Multi-Sensory Approach To Buried Asset Detection
The Manufacturing Technology Centre Ltd
1/03/20 → 31/12/23
Project: Industry
-
-
Train Control Algorithm Development for Thameslink
Schmid, F. & Roberts, C.
NETWORK RAIL INFRASTRUCTURE LTD
1/10/09 → 30/09/11
Project: Industry
-
Feasibility Study: Effects of Saturation of Soil Surround on Leakage from Water Distribution
12/04/02 → 30/04/05
Project: Industry
-
-
Schedule Optimization of Railway Drainage Maintenance Operations
NETWORK RAIL INFRASTRUCTURE LTD
1/10/18 → 31/05/19
Project: Industry
-
-
Research into Foaming in Activated Sludge PlantsV Plant
Forster, C.
1/10/93 → 31/10/96
Project: Industry
-
-
Design for Improved Buildability of Bridges (CIRIA)
Clark, L. & Perry, J.
TAYLOR WOODROW CIVIL ENGINEERING LIMITED
4/02/94 → 30/04/95
Project: Industry
-
Bond Tests in TSA Columns
Gorst, N. & Clark, L.
RAYNESWAY CONSTRUCTION SOUTHERN LIMITED
1/01/01 → 30/06/01
Project: Industry
-
-
-
Framework for the Inclusion of Social Benefits in Transport Planning: CON:05890
Odoki, J. & Kerali, H.
1/10/02 → 31/07/04
Project: Industry
-
Integrated Catchment Simulation
West, J. & Forster, C.
CHARLES HASWELL & PARTNERS LIMITED
1/07/00 → 30/06/01
Project: Industry
-
-
Research into AR Fibres in Concrete
Gorst, N.
FIBRE TECHNOLOGIES INTERNATIONAL LTD
1/05/03 → 30/04/04
Project: Industry
-
Charaterising WTW Performance Using Fluorescence Spectroscopy
Bridgeman, J.
1/10/06 → 30/09/09
Project: Industry
-
-