Projects per year
- 400 - 450 out of 2,160 results
Search results
-
Industry
-
Advanced Techniques for Aircraft Power Conditioning Systems(Case - Gregory)
Forsyth, A. & Evans, P.
1/10/92 → 30/09/95
Project: Industry
-
Early Failure Warning Systems for Mechanical SignallingSystems-Condition Monitoring System on Metropolitan Line
Allan, J.
1/09/95 → 28/02/96
Project: Industry
-
-
Computer Simulation Study of a 3 Phase reversablew AC/DC Static Converter
Evans, P.
1/08/92 → 31/08/92
Project: Industry
-
The Development and Investigation of QoS Management for Integrated and Differenciated Services Over IP
Woolley, S.
FUJITSU TELECOMMUNICATIONS EUROPE LTD
1/10/99 → 30/06/03
Project: Industry
-
Ductility & Robustness of Concrete Structures Under Accidental Load Cases
Clark, L. & Williamson, S.
14/03/05 → 30/04/08
Project: Industry
-
-
Simulation of Vehicle Durability Cycles Using Remote Parameter Control
Olatunbosun, R.
1/05/01 → 30/04/05
Project: Industry
-
TCS Miniaturised Advanced WirelessControl System forDomestic Environments
Hall, P. & Edwards, J.
SUMMIT CHARLES BOOTH PARTNERSHIP
1/01/97 → 31/12/98
Project: Industry
-
-
Performance Predication of air to air heat pipe heat exchanger
STERLING THERMAL TECHNOLOGY LTD
1/08/10 → 31/08/10
Project: Industry
-
-
DTC2 - Human Factors Integration Project Phase 2 (Core Account)
Stone, B. & Baber, C.
AEROSYSTEMS INTERNATIONAL LIMITED
1/04/06 → 1/04/09
Project: Industry
-
The Development of more Environmentally FriendlyReplacements for Synthetic Rubber.
Lehrle, R.
1/08/92 → 30/09/97
Project: Industry
-
Measurement of Multipaths in Physical Radion Channels
Constantinou, C. & Arvanitis, T.
BRITISH TELECOMMUNICATIONS PLC
1/08/00 → 31/01/01
Project: Industry
-
-
Student Support Machinability of TINI shape memory alloys
Soo, L. & Aspinwall, D.
1/02/06 → 31/01/09
Project: Industry
-
Modelling of Damage Evolution in Hot Rolling Process
Lin, J. & Ball, A.
1/10/99 → 30/09/02
Project: Industry
-
Laboratory and Site Work Associated with Clay Stabilisation at 84 Broadmoor Lane, Bath
Rogers, C. & Boardman, D.
1/01/01 → 30/09/05
Project: Industry
-
-
-
Investigation of Voice-Based Aims and User Issues
NCR FINANCIAL SOLUTIONS GROUP LTD
1/06/94 → 30/09/94
Project: Industry
-
The Kinetics,Mechanisms,and Energetics of ThermalDegradation of Biopol Polymers and Copolymers
Lehrle, R.
1/08/92 → 30/09/94
Project: Industry
-
Identifying sustainable refurbishment options for listed-post war educational buildings (Y A AISHEH)
Gaterell, M.
BUILDING RESEARCH ESTABLISHMENT - BRE0001
1/03/07 → 31/08/10
Project: Industry
-
Advance Engine Programme. Thermodynamic Assessment of aboosted Turbocharging for Diesel Engines
Randle, J. & Wyszynski, M.
31/07/95 → 30/10/95
Project: Industry
-
-
-
Use of Mathematical Models to Minimise Cost & Risk for Sewage Treatment Work Design & Operation
West, J.
20/08/95 → 31/07/98
Project: Industry
-
-
Multi Frequency Antennas For Personal Mobile Communications
Hall, P.
BRITISH TELECOMMUNICATIONS PLC
1/11/94 → 31/10/97
Project: Industry
-
Research into the Potential Effectiveness of SmartRestraints
Hill, J. & Cuerden, R.
31/07/97 → 29/04/98
Project: Industry
-
Network Rail Drainage Risk Model
Ghataora, G. & Burrow, M.
NETWORK RAIL INFRASTRUCTURE LTD
1/07/19 → 31/05/21
Project: Industry
-
CASE (Rudman): The Social & Group Interaction Implications of Implementing a Personal Learning Resource
Sharples, M.
BRITISH TELECOMMUNICATIONS PLC
27/09/99 → 26/09/02
Project: Industry
-
-
CASE AWARD (J M Wise) : Requirement Development and RiskReduction for Major Systems
Allan, J.
1/10/95 → 30/09/98
Project: Industry
-
-
Link: An Integrated Strategic Planning Process for Road Maintenance
Snaith, M.
1/03/98 → 31/03/00
Project: Industry
-
-
-
-
Aftertreatment System for Natural Gas Fuelled Engines
Tsolakis, A. & Gough, R.
1/10/18 → 31/12/22
Project: Industry
-
-
Case Quota - IJ Green. Characteristics of Track CircuitDetectors
Goodman, C.
4/10/93 → 3/10/96
Project: Industry
-
Implementation of Performance Specification for Capping and Subgrade
SCOTT WILSON PAVEMENT ENGINEERING
1/03/00 → 30/06/02
Project: Industry
-
-
Biometrics for Keyless Automotive Access
Russell, M.
MERITOR LIGHT VEHICLE SYSTEMS UK LTD
1/10/00 → 30/09/01
Project: Industry
-
Car Occupant Characteristics Crash Injury Factor and Adaptive Restraints
Hill, J.
7/12/97 → 6/02/99
Project: Industry
-
Ocean Surface Communications
Atkins, P.
DEFENCE SCIENCE & TECHNOLOGY LABORATORY
1/12/04 → 31/03/06
Project: Industry