Projects per year
- 250 - 300 out of 916 results
Search results
-
Industry
The assessment of anemometer based wind alert systems
Baker, C., Chapman, L., Quinn, A. & Roberts, C.
4/09/13 → 29/11/13
Project: Industry
-
HS2 Resilience Analysis - Part 2
Mills, S., Plummer, P., Holland, A., Nicholson, G. & Roberts, C.
27/05/22 → 28/09/23
Project: Industry
-
Simulation & Testing of Railway Traffic Management & Train Control Algorithms
Roberts, C.
4/10/10 → 3/04/14
Project: Industry
-
-
Hyd-Energy: Feasibility and concept design of future hydrall enabled railway depots
1/04/19 → 30/09/19
Project: Industry
-
-
CLEAR2: T1234 Air Quality on Trains-HVAC and Exhaust Interactions Study
Hemida, H., Mills, S., Soper, D., Hillmansen, S. & Entezami, M.
10/02/21 → 30/03/22
Project: Industry
-
-
Hydrogen supply in the railway system
Mills, S., Hillmansen, S. & Zhao, N.
NETWORK RAIL INFRASTRUCTURE LTD
15/12/21 → 25/03/22
Project: Industry
-
Research into Electromagnetic Characterisation Techniques for Ferrite Materials
Smith, P.
APPLIED FUNCTIONAL MATERIALS LTD
17/10/05 → 16/04/06
Project: Industry
-
Collection of Human Error Probabilites from SellafieldIncident
Kirwan, B.
1/09/93 → 31/03/94
Project: Industry
-
-
Diagnosis of Gas Meter Condition and State of Gas Network Supply
Norton, J.
1/08/98 → 31/01/00
Project: Industry
-
Efficient Engineering Assurance Target 190
NETWORK RAIL INFRASTRUCTURE LTD
1/08/22 → 31/07/23
Project: Industry
-
Collection of Offshore Drilling and Permit-to-Work HumanError Probability Data
Kirwan, B.
15/04/96 → 14/11/97
Project: Industry
-
Study on Reduction of Peak Demand from Traction Power(Commission No 8074), Job No : 509360
Allan, J.
3/08/93 → 30/09/95
Project: Industry
-
Further Research and Development of Saber Models for Aircraft Systems
Forsyth, A. & Mollov, S.
11/06/01 → 10/09/01
Project: Industry
-
Image Data Compression of Textured Surfaces for Simulation
Spann, M.
1/08/92 → 30/09/94
Project: Industry
-
Research into Human Reliability and Human Factors Supportto BNFL Risley Safety Department
Kirwan, B.
1/12/93 → 31/03/94
Project: Industry
-
-
-
-
Advanced interfaces and virtual reality applications forprocess control
Kirwan, B.
1/10/95 → 31/03/97
Project: Industry
-
Image Analysis Edge Detection Tools for Food Inspection
Pycock, D.
12/01/99 → 11/08/99
Project: Industry
-
Case Award - Brumm Improved Methods for Modelling Turbine Engine Gas Flow
Norton, J.
1/08/92 → 30/09/94
Project: Industry
-
Efficient Power Network Solutions Methods for a TrainNetwork Simulator
Goodman, C.
WESTINGHOUSE SIGNALS LIMITED R & D
1/10/92 → 30/09/94
Project: Industry
-
Understanding & Controlling The 2-4 Hour Shift Phenomenon
Kirwan, B. & Megaw, E.
1/02/96 → 31/07/97
Project: Industry
-
-
-
-
Further Research:Early-Failure Warning Systems for RailwaySignalling Equipment.Condition Monitoring Northern Line
Fararooy, S. & Allan, J.
1/10/95 → 30/09/96
Project: Industry
-
Atkins Rail Contract ZSR 594 - Develop existing DC multi train simulator
Goodman, C.
BIRMINGHAM RESEARCH & DEVELOPMENT LTD
1/04/04 → 30/09/07
Project: Industry
-
-
-
Support PhD - S Parrish - Behavioural Synthesis of Analogue Integrated Circuits
1/10/02 → 30/09/04
Project: Industry
-
-
Investigate Algorithms for Measurement and Classificsation of Subharmonics in Complex Data Signals
Pycock, D.
1/11/01 → 30/06/02
Project: Industry
-
Human Factors Evaluation of Command Room HMI
Stone, B. & Easton, J.
1/12/22 → 31/05/23
Project: Industry
-
Improving Systems Engineering Capability of Railway Projects
Allan, J.
1/09/98 → 31/10/99
Project: Industry
-
-
Driving Monitoring and Control of Future Drive Value SystemsCASE - D J Moule
Forsyth, A.
3/10/94 → 28/02/98
Project: Industry
-
Avanti PTI
Fu, Q., Mills, S., Plummer, P. & Easton, J.
First Trenitalia West Coast Rail Ltd
13/03/23 → 31/07/23
Project: Industry
-
-
Mission Systems 2035 - Human-Machine Interface Concepts
Stone, B. & Tarte, E.
1/08/13 → 31/01/14
Project: Industry
-
-
MicrowavePower Amplifier Linearisation by Analogue Predistortion
Gardner, P.
1/05/00 → 30/09/00
Project: Industry
-