Abstract
Dubin and Rothwell (1990) use details of insurance premiums to develop a methodology for inferring the value to nuclear operators of the Price-Anderson liability limit from but misinterpret the terms of the insurance contracts for which the premiums are paid. This leads them to overstate the subsidy due to the limit by a factor of between four and ten.
Original language | English |
---|---|
Pages (from-to) | 122-124 |
Number of pages | 3 |
Journal | Contemporary Economic Policy |
Volume | 16 |
Issue number | 1 |
DOIs | |
Publication status | Published - 1998 |
ASJC Scopus subject areas
- General Business,Management and Accounting
- Economics and Econometrics
- Public Administration