Abstract

In July 2009, the UK government announced plans to electrify the Great Western Main Line and the line between Liverpool and Manchester [1]. It has been widely argued that railway electrification is needed on more routes, but it is more difficult to construct a financial case for doing so. One such case is the heavily-used Trans-Pennine route from Manchester to Leeds via Dewsbury and Huddersfield. The main operator on this route, First TransPennine Express, is currently using high-powered diesel multiple units in order to adhere to stringent performance criteria. These trains are frequently overcrowded at peak times, because the route serves commuters who travel to Leeds, York and Manchester from throughout the North of England, as well as longer-distance travellers [2]. Electrifying the Trans-Pennine route would not be an easy task. There are many areas where the railway is built in cuttings, tunnels, on the side of hills and round tight curves. One way to deal with this problem would be to electrify the railway discontinuously, that is to only install catenary where it is cheap and easy to do so. Modern energy storage techniques could then be used to ensure that trains always have an adequate supply of power. This tradeoff would reduce the overall cost of electrification and therefore enable compelling business cases to be established for more routes.

Original languageEnglish
Title of host publicationIET Seminar Digest
PublisherInstitution of Engineering and Technology
Volume2010
Edition13342
ISBN (Print)9781849192118
DOIs
Publication statusPublished - 9 Sept 2010
EventIET Conference on Railway Traction Systems, RTS 2010 - Birmingham, United Kingdom
Duration: 13 Apr 201015 Apr 2010

Conference

ConferenceIET Conference on Railway Traction Systems, RTS 2010
Country/TerritoryUnited Kingdom
CityBirmingham
Period13/04/1015/04/10

Keywords

  • Business case
  • Diesel multiple units
  • England
  • Manchester
  • Overall costs
  • Peak time
  • Performance criterion
  • Storage technique

ASJC Scopus subject areas

  • Electrical and Electronic Engineering

Fingerprint

Dive into the research topics of 'Investigating discontinuous electrification and energy storage on the northern trans-pennine route'. Together they form a unique fingerprint.

Cite this