Project Details
Short title | Power System Dynamic loading simulation study (Phase 1) |
---|---|
Status | Finished |
Effective start/end date | 3/04/17 → 6/10/18 |
Funding
- SMRT LTD
Short title | Power System Dynamic loading simulation study (Phase 1) |
---|---|
Status | Finished |
Effective start/end date | 3/04/17 → 6/10/18 |