Keyphrases
Force Prediction
100%
Concrete Lining
100%
Lining System
100%
Horizontal Directional Drilling
100%
Microtunneling
100%
Numerical Analysis
100%
Long Distance
50%
PLAXIS
25%
Normal Strength Concrete
25%
Polymer Concrete
25%
Borehole Collapse
25%
Extruded Material
25%
Electrical Cable
25%
Conventional Drilling
25%
Drilling Rig
25%
Line Segments
25%
Tunnel Lining
25%
Minimal Surfaces
25%
Curing Time
25%
Modeling Packages
25%
Maximum Distance
25%
Pipe Diameter
25%
Trenchless Technology
25%
Numerical Model
25%
Time-based
25%
Commercially Available
25%
Finite Element Modeling
25%
Economically Viable
25%
Extrusion
25%
Stiffness
25%
Engineering
Concrete Lining
100%
Microtunneling
100%
Horizontal Directional Drilling
100%
Limitations
66%
Strength Concrete
33%
Early Phase
33%
Fem Model
33%
Numerical Model
33%
Electrical Cable
25%
Drilling Rig
25%
Borehole Collapse
25%
Great Distance
25%
Pipe Diameter
25%
Disruptions
25%
Mm Diameter
25%
Trenchless Technology
25%