Projects per year
- 450 - 500 out of 576 results
Search results
-
Industry
-
EPSRC Case Award - Increasing the efficiency of anaerobic waste digesters
Bridgeman, J.
1/09/10 → 28/02/14
Project: Industry
-
-
Laboratory and Site Work Associated with Clay Stabilisation at 84 Broadmoor Lane, Bath
Rogers, C. & Boardman, D.
1/01/01 → 30/09/05
Project: Industry
-
Feasibility Study: Effects of Saturation of Soil Surround on Leakage from Water Distribution
12/04/02 → 30/04/05
Project: Industry
-
-
Report on Asset Location and Condition Assessment of Buried Pipes
UK WATER INDUSTRY RESEARCH LTD
1/04/02 → 30/09/02
Project: Industry
-
-
Hydrological and Hydrogeological Research on Folkestone BedsPhase 1,2,3 & 4
Rushton, K.
1/07/93 → 28/02/95
Project: Industry
-
-
Derivation of Routing Parameters for Cross-Section Survey
Knight, D.
1/12/95 → 31/12/98
Project: Industry
-
ORFEUS Stakeholder Questionnaire Analysis
UK WATER INDUSTRY RESEARCH LTD
1/04/07 → 30/04/07
Project: Industry
-
Strategic Partnership in Railway Data Integration
Schmid, F., Roberts, C. & Gough, R.
NETWORK RAIL INFRASTRUCTURE LTD
1/02/12 → 31/03/22
Project: Industry
-
Effective signage to prevent Trespass
Baber, C. & Jack, A.
NETWORK RAIL INFRASTRUCTURE LTD
27/04/20 → 7/09/20
Project: Industry
-
Research on New Asset Management Approaches for Maintaining and Improving Local Road Access - Phases 2 and 3 GEN2018C
Burrow, M. & Ghataora, G.
CARDNO EMERGING MARKETS (UK) LTD
5/12/16 → 30/06/20
Project: Industry
-
Analysis of a new switch stretch bar design
Hemida, H., Roberts, C. & Stewart, E.
NETWORK RAIL INFRASTRUCTURE LTD
1/03/12 → 31/05/13
Project: Industry
-
Research on New Asset Management Approaches for Maintaining and Improving Local Road Access - Phase 1 (16-0755)
Burrow, M. & Ghataora, G.
ROUGHTON INTERNATIONAL LIMITED
1/11/15 → 31/08/17
Project: Industry
-
-
RSSB Studentship - Scour around Bridge Piers
Baker, C. & Sterling, M.
1/10/11 → 31/12/12
Project: Industry
-
The assessment of anemometer based wind alert systems
Baker, C., Chapman, L., Quinn, A. & Roberts, C.
4/09/13 → 29/11/13
Project: Industry
-
Student Support (S Kho): Unsteady Wind Loading on Buildings and Vehicles
Baker, C.
1/10/99 → 30/09/02
Project: Industry
-
Algorithms to Predict Switch Failure for Intelligent Infrastructure
Roberts, C. & Watson, C.
NETWORK RAIL INFRASTRUCTURE LTD
1/07/11 → 30/06/13
Project: Industry
-
Train Control Algorithm Development for Thameslink
Schmid, F. & Roberts, C.
NETWORK RAIL INFRASTRUCTURE LTD
1/10/09 → 30/09/11
Project: Industry
-
-
Wind Actions on OLE conductors
Soper, D., Jesson, M., Hemida, H., Theofanous, M. & Sterling, M.
NETWORK RAIL INFRASTRUCTURE LTD
18/10/21 → 28/07/23
Project: Industry
-
MIRO: Re-use of Quarry Assets
Ghataora, G.
BIRMINGHAM RESEARCH & DEVELOPMENT LTD
1/10/04 → 31/03/07
Project: Industry
-
-
Schedule Optimization of Railway Drainage Maintenance Operations
NETWORK RAIL INFRASTRUCTURE LTD
1/10/18 → 31/05/19
Project: Industry
-
-
Resource Efficient Technology for soil performance remediation and monitoring
Jefferson, I., Boardman, D. & Rogers, C.
1/10/10 → 31/03/14
Project: Industry
-
-
Integrated Catchment Simulation
West, J. & Forster, C.
CHARLES HASWELL & PARTNERS LIMITED
1/07/00 → 30/06/01
Project: Industry
-
-
-
Network Rail PhDs 3/6 Mapping the resilience of green transport corridors to strong winds effects
NETWORK RAIL INFRASTRUCTURE LTD
1/09/22 → 31/08/26
Project: Industry
-
AELTCC Raker Beams
Clark, L. & Gorst, N.
THE ALL ENGLAND LAWN TENNIS & CROQUET CLUB
1/11/01 → 31/12/01
Project: Industry
-
-
-
CSMA Sleeper Condition Survey
Clark, L. & Gorst, N.
CONCRETE SLEEPER MANUFACTURERS ASSOCIATION
1/02/02 → 31/03/02
Project: Industry
-
-
-
-
Student Sponsorship(J W Boddy)
Seymour, D.
AMEC DESIGN & MANAGEMENT LIMITED
1/04/97 → 31/10/98
Project: Industry
-
Inter-Tidal zone cohesive sediment transport processesCase Quota
West, J.
1/08/92 → 30/09/93
Project: Industry
-
New Engineering Contract - Development of Flowchart
Perry, J.
THOMAS TELFORD SERVICES LIMITED
1/04/97 → 31/12/99
Project: Industry
-
-
Water Resources Study
Rushton, K.
SOUTH STAFFORDSHIRE WATERWORKS COMPANY
1/08/92 → 30/09/93
Project: Industry
-
Assess the Feasibility of Using LUL Data and Rules within Railtrack
Madelin, K.
1/10/00 → 31/01/01
Project: Industry