Value of rail inspection reschedules

Mohd Haniff Bin Osman, Sakdirat Kaewunruen

Research output: Contribution to journalArticlepeer-review

3 Citations (Scopus)
197 Downloads (Pure)

Abstract

A regular rail inspection schedule has been proposed to minimise any detrimental financial cost incurred due to operations under harsh environments. Missed opportunities to detect a defective rail could lead ultimately to it breaking, which would magnify the repair (as well as maintenance) cost, by approximately 30-35% per rail-mile. However, the performance of a pre-planned inspection schedule may be affected by disruptions in one or more element(s) of inspection such as machine/vehicle breakdown or track unavailability, which are usually unpredictable events. As part of the justification for the need to manage a disrupted inspection schedule, this paper proposes a methodology that highlights the value of rescheduling. An extensive literature search was undertaken on the rescheduling framework in order to determine appropriate policies, strategies and methods for rail inspection. As a result, the value of rescheduling is formulated as the ratio of rescheduling cost to a change in value of risk from a missed opportunity to repair a defective rail i.e., late defect detection. This numerical formula demonstrates how the proposed methodology is useful for filtering out a rescheduling strategy that has (negative) value when dealing with a disrupted rail inspection schedule. The discussion portrays several potential aspects to feasibly extend the proposed methodology on large scale of rail network.
Original languageEnglish
Number of pages8
JournalProceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
Early online date30 Dec 2018
DOIs
Publication statusE-pub ahead of print - 30 Dec 2018

Keywords

  • Rail inspection
  • rail maintenance
  • rescheduling
  • disruption
  • decision value
  • risk analysis
  • P-F interval

Fingerprint

Dive into the research topics of 'Value of rail inspection reschedules'. Together they form a unique fingerprint.

Cite this