Numerical evaluations of codified design methods for progressive collapse resistance of precast concrete cross wall structures

M. Tohidi, J. Yang*, C. Baniotopoulos

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

13 Citations (Scopus)

Abstract

Progressive collapse of building structures typically occurs when an abnormal loading condition causes a sudden loss in the structural capacity of one or more critical members, which leads to a chain reaction of failure and ultimately catastrophic collapse. The tensile tie force (TF) method is one of the main design approaches for considering progressive collapse. As this method does not take into account factors such as dynamic effect, the load redistribution mechanism, the effect of steel-concrete interfacial properties, or the size and embedment length of tie bars on bond behaviour, it can be considered as a simplified method, and hence a thorough examination of the adequacy of this method is needed. This paper reports such a study including numerical evaluation of the codified methods of progressive collapses for precast concrete cross wall buildings. To this end, detailed three-dimensional finite element models of the pullout behaviour of strands in the keyway of precast concrete blocks and of the ductility behaviour of floor joints subjected to uniform and line loads exerted from upper walls were developed. Through a calibration process for a series of laboratory pullout tests carried out by the Portland Cement Association (PCA), the interfacial bond properties were established using numerical modelling. The same modelling method was then used in the subsequent three dimensional non-linear numerical analyses to simulate the ductility behaviour of precast concrete floor joints in the absence of underlying wall supports. In both modelling processes, the simulation of the bond-slip behaviour at the steel-concrete interface was realised by using the "translator" element embedded in ABAQUS. The numerical analyses showed a close agreement between FE analyses and test results. The tie force developed during the collapse process was particularly examined. Discrepancies in the tie force between the numerical and the codified specifications have suggested an underestimate of tie force in the TF method that may lead to an unsafe design. Finally, an improved model based on the numerical results has also been proposed to address this problem.

Original languageEnglish
Pages (from-to)177-186
Number of pages10
JournalEngineering Structures
Volume76
Early online date25 Jul 2014
DOIs
Publication statusPublished - 1 Oct 2014

Keywords

  • Bond
  • Catenary action
  • Cross wall construction
  • Ductility
  • Post-bond-failure analysis
  • Progressive collapse
  • Ties force method
  • Translator element

ASJC Scopus subject areas

  • Civil and Structural Engineering

Fingerprint

Dive into the research topics of 'Numerical evaluations of codified design methods for progressive collapse resistance of precast concrete cross wall structures'. Together they form a unique fingerprint.

Cite this