Abstract
On-demand (or unplanned) track inspection could be due to a disruption in a track geometry recording car. A proper selection of input- and output-memory order which is required for prediction of missing track measurement using a nonlinear autoregressive model with external series(NARX) is expected to create value added to the inspection decision.
Original language | English |
---|---|
Number of pages | 3 |
Journal | Proceedings |
Volume | 2 |
Issue number | 16 |
DOIs | |
Publication status | Published - 17 Sept 2018 |
Keywords
- track inspection
- unplaned inspection
- unplaned maintenance
- value
- balance
- strategy
- track maintenance