Projects per year
Abstract
The temperature drive cable was replaced, a new water-loop motor and pump was installed, and an air conditioner was replaced. The current-limit on the mount motors was increased, and the mount gears cleaned and re-lubricated.
| Original language | English |
|---|---|
| Publisher | Birmingham Solar Oscillations Network |
| Volume | 375 |
| Publication status | Published - 4 Dec 2015 |
Publication series
| Name | BiSON Technical Report Series |
|---|---|
| Publisher | Birmingham Solar Oscillations Network |
| No. | 375 |
Keywords
- Helioseismology, Observations
- Oscillations, Solar
Fingerprint
Dive into the research topics of 'Temperature control repairs in Narrabri in 2015 October'. Together they form a unique fingerprint.Projects
- 1 Finished
-
Asteroseismology and Helioseismology at Birmingham and Queen Mary
Chaplin, B. (Principal Investigator), Elsworth, Y. (Co-Investigator) & Miglio, A. (Co-Investigator)
SCIENCE & TECHNOLOGY FACILITIES COUNCIL
1/04/15 → 30/09/18
Project: Research Councils
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver