Keyphrases
Toughness
100%
Concrete Sleeper
100%
Repeated Impact Load
100%
Residual Energy
100%
Railway Track Structure
100%
Design Considerations
25%
Railway Track
25%
Sleeper
25%
Impact Load
25%
Axle Load
25%
Fatigue Limit State
25%
Limit State Design
25%
In Situ
12%
Impact Response
12%
Impact Force
12%
Low-to-moderate
12%
Impact Behavior
12%
Loading Conditions
12%
Serviceability Limit State
12%
Railway Network
12%
High Capacity
12%
Static Condition
12%
Drop Test
12%
High Magnitude
12%
Residual Capacity
12%
Design Concept
12%
Force Distribution
12%
Railway Track System
12%
High Endurance
12%
Track Forces
12%
Impact Loading
12%
Reserve Capacity
12%
Design Life
12%
Train Operation
12%
Impact Damage
12%
Wheel Load
12%
Capacity Drop
12%
Wheel Flat
12%
Wollongong
12%
Railroad Ties
12%
Cross-tie
12%
Limit State
12%
Ultimate Limit State
12%
Australian Standards
12%
Heavy-haul Rail
12%
Impact Limits
12%
Prestressed Concrete
12%
Design Guidance
12%
Repeated Load
12%
Repeated Impact Test
12%
Repeated Impact Loading
12%
Accumulative Impacts
12%
Impact Magnitude
12%
Impact Testing Machine
12%
Damage Energy
12%
Engineering
Railway
100%
Impact Loads
100%
Prestressed Concrete
100%
Concrete Sleeper
100%
Residual Energy
100%
Limit State
37%
Fatigue Limit
25%
Axle Load
25%
Design Consideration
25%
Limit State Design
25%
Testing Machine
12%
Impact Response
12%
Impact Force
12%
Impact Test
12%
Impact Behavior
12%
Loading Condition
12%
Serviceability
12%
Experimental Investigation
12%
Impact Testing
12%
Static Condition
12%
Design Concept
12%
Design Life
12%
Impact Damage
12%
Railroad Ties
12%
Design Guidance
12%
Severe Impact
12%
Capacity Reserve
12%