Effects of vertical and through holes on cyclic behaviour of railway concrete sleepers

Dan Li, Ruilin You, Sakdirat Kaewunruen

Research output: Chapter in Book/Report/Conference proceedingConference contribution

233 Downloads (Pure)

Abstract

Railway sleeper is the very important element in rail track structure. Nowadays, prestressed concrete is the most common type used in railway sleeper because of its good structural performance. The main duties of sleeper are to distribute the wheel load to the formation and keep the rail gauge. Most of current design codes for sleepers design techniques rely on allowable stresses and material strength. However, railway sleepers also experience high frequent cyclic load due to wheel-rail interaction. The cracking could occur in prestressed concrete sleepers due to cyclic behaviour and accumulation of fatigue could finally result in prestressed concrete sleepers’ failure. In addition, the concrete sleepers are often modified on construction sites to fit in other systems such as cables, signalling gears, drainage pipes, etc. This paper presents the results of the extensive theoretical and analytical investigation aimed at predicted cyclic behaviour on prestressed concrete sleepers with holes. It highlights the effects on cyclic behaviours of railway concrete sleepers. The insight of this paper can be used to evaluate the service performance and predict the cyclic behaviours of the concrete sleeper, as well providing design flexibility and broadening the design principle. The outcome of this study may also improve the rail track maintenance and inspection criteria, in order to establish an appropriate track condition monitoring network in practice.
Original languageEnglish
Title of host publicationThe 5th International Conference on Road and Rail Infrastructure
PublisherUniversity of Zagreb
Pages749-755
ISBN (Print)9789538168253
DOIs
Publication statusPublished - 19 May 2018
EventThe 5th International Conference on Road and Rail Infrastructure : CETRA2018 - Zadar, Zadar, Croatia
Duration: 17 May 201819 May 2018
http://master.grad.hr/cetra/ocs/index.php/cetra5/cetra2018

Conference

ConferenceThe 5th International Conference on Road and Rail Infrastructure
Abbreviated titleCETRA2018
Country/TerritoryCroatia
CityZadar
Period17/05/1819/05/18
Internet address

Keywords

  • railway infrastructure
  • prestressed concrete sleeper
  • cyclic behaviour
  • fatigue
  • time-dependence

Fingerprint

Dive into the research topics of 'Effects of vertical and through holes on cyclic behaviour of railway concrete sleepers'. Together they form a unique fingerprint.

Cite this