Correction: Future Circular Collider Feasibility Study Report: Volume 3 Civil Engineering, Implementation and Sustainability

  • The FCC Collaboration

Research output: Contribution to journalComment/debate

Abstract

Correction: Eur. Phys. J. Spec. Top. https://doi.org/10.1140/epjs/s11734-025-01958-5

The Image Sources and Credits information section was missing from this article and should have read ‘The FCC Project formally acknowledges and credits all organisations and contributors whose data and imagery form part of the basemaps used in this work. These include © Esri, Airbus DS, FAO, FEMA, GSA, NASA, NGA, NOAA, USGS, CGIAR, NCEAS, Rijkswaterstaat, SITG – State of Geneva (CH), swisstopo, Facebook, Garmin, Geoland, Geodatastyrelsen, Google, Intermap, Maxar, Microsoft, N Robinson, NLS, NMA, OS, Planet, TomTom, as well as © OpenStreetMap contributors, Esri Community Maps contributors, and the GIS User Community.

Every effort has been made to correctly acknowledge all data providers and rights holders. Any omission is unintentional, and the FCC Project remains available to review and amend credits upon request from legitimate data owners.’

The original article has been corrected.
Original languageEnglish
Number of pages12
JournalThe European Physical Journal Special Topics
DOIs
Publication statusE-pub ahead of print - 19 Nov 2025

Bibliographical note

Correction: Eur. Phys. J. Spec. Top. https://doi.org/10.1140/epjs/s11734-025-01958-5

Fingerprint

Dive into the research topics of 'Correction: Future Circular Collider Feasibility Study Report: Volume 3 Civil Engineering, Implementation and Sustainability'. Together they form a unique fingerprint.

Cite this