Project Details
| Short title | Shift2Rail In2Track2 - Detailed design and prototyping of next generation S&C kinematic systems (REPOINT) |
|---|---|
| Status | Finished |
| Effective start/end date | 1/09/20 → 30/08/21 |
Funding
- European Commission
| Short title | Shift2Rail In2Track2 - Detailed design and prototyping of next generation S&C kinematic systems (REPOINT) |
|---|---|
| Status | Finished |
| Effective start/end date | 1/09/20 → 30/08/21 |