Project Details
Short title | Controlling Casimir force using optical metamaterials |
---|---|
Status | Finished |
Effective start/end date | 1/09/13 → 30/08/17 |
Funding
- Leverhulme Trust
Short title | Controlling Casimir force using optical metamaterials |
---|---|
Status | Finished |
Effective start/end date | 1/09/13 → 30/08/17 |